Front page / A to Z
A to Z
The trade words and official terms that appear in the journal.
- Building surveyor
- The registered professional who issues building permits and carries out the mandatory inspections.
- Certificate of Electrical Safety
- The certificate a licensed electrician must issue for electrical work on a home in Victoria.
- Compliance certificate
- A licensed plumber's certification that plumbing work meets the regulations; required in Victoria for work over $750.
- Cutting in
- Painting the edges of a surface by brush, along ceilings, corners and trims, before rolling the rest.
- Enamel
- A hard-wearing paint finish used on doors, windows and trims.
- Home Warranty insurance
- Cover a Victorian builder must take out from 1 July 2026 for work over $20,000 on homes of up to three storeys.
- Major domestic building contract
- The written contract required in Victoria for domestic building work over $10,000.
- Membrane
- The waterproof layer applied to wet-area floors and walls before tiling.
- Primer
- The first coat on bare or repaired surfaces, which seals them and helps later coats bond.
- Registered building practitioner
- A builder or tradesperson registered with the Building and Plumbing Commission to carry out specified building work.
- Rough-in
- The stage when pipes and cables are run inside open walls, before linings go on.
- Sheen
- How shiny a paint finish is, from flat and matt through low sheen and satin to gloss.
- Undercoat
- A coat that builds a smooth, even base for the finishing coats.
- Wet sanding
- Sanding with water to keep dust out of the air; the method recommended for old paint that may contain lead.